Skip to content
01642 039555
en
Skip to product information
Description

Brand   

CLiPtec OCC103 USB2.0 Metal ended Nylon Braided Micro USB Cable is a durable, high quality precision finish and high speed connection that harnesses the full capability of the USB 2.0 standard data transfer speed and power charging your device. Ideal for syncing data and charging the latest Smartphones, tablets, MP3 players, mobile phones, PDA's, digital cameras.

Features

Data transmission and charge for phone of Micro USB cable.
Support Hot-plug and Plug 'n' play.
Gold plated for optimum connectivity.
Able to support sync and power.

Specifications

Cable Type USB 2.0 Cable
Connectors Type USB A-Male to Micro-B
Cable Length 1.0 m Braided Cable
Cable Jacket Material Metal/TPE
Cable O.D. 3.5 mm

Product Information

Connector-A USB-A Male

Connector-B USB Micro-B Male

Cable type USB 2.0

Cable Length 1.00 M

Connector Design Side-A Straight

Connector Design Side-B Straight

CliPtec Heavy Duty Micro USB Charging Cable Braided Fast Phone Charger Long Lead 1m - Green

Regular price £2.32
Sold out
Stock Location & Availability
Loading locations...

What does this mean? See more on our Delivery page.



Specifications
No video available for this product

Brand   

CLiPtec OCC103 USB2.0 Metal ended Nylon Braided Micro USB Cable is a durable, high quality precision finish and high speed connection that harnesses the full capability of the USB 2.0 standard data transfer speed and power charging your device. Ideal for syncing data and charging the latest Smartphones, tablets, MP3 players, mobile phones, PDA's, digital cameras.

Features

Data transmission and charge for phone of Micro USB cable.
Support Hot-plug and Plug 'n' play.
Gold plated for optimum connectivity.
Able to support sync and power.

Specifications

Cable Type USB 2.0 Cable
Connectors Type USB A-Male to Micro-B
Cable Length 1.0 m Braided Cable
Cable Jacket Material Metal/TPE
Cable O.D. 3.5 mm


Connector-A USB-A Male

Connector-B USB Micro-B Male

Cable type USB 2.0

Cable Length 1.00 M

Connector Design Side-A Straight

Connector Design Side-B Straight

CliPtec Heavy Duty Micro USB Charging Cable Braided Fast Phone Charger Long Lead 1m - Green

Go on, have a browse — you never know what you’ll find next.

Love this product? Discover more from our full collection.

From smart tech to home must-haves, explore the range and find your next great buy at Boxed2Me.

Delivering More Than Just The Box

We’re proud to be UK-based, built from the ground up by people who genuinely care about getting things right. Whether it’s a kitchen essential or the latest bit of tech, our goal is simple: make it easy, make it affordable, and make it work for you.

Secure Payment

Fast UK Shipping

Free shipping over £20*

Customer Service from 9am Till Late

Drawer Title
Similar Products